两个人做人爱视频免费,97久久精品人人搡人妻人人玩,欧洲精品码一区二区三区,999zyz玖玖资源站永久

我要投稿 投訴建議

12月英語六級閱讀強化訓(xùn)練

時間:2021-01-16 12:16:48 英語六級 我要投稿

2014年12月英語六級閱讀強化訓(xùn)練

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標(biāo)準(zhǔn)件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

2014年12月英語六級閱讀強化訓(xùn)練

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. Which of these statements is TRUE of system building?

  A. It employs more men.

  B. It is difficult and dangerous.

  C. It can save both time and money.

  D. It means less mechanization.

  2. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. What lifts the concrete panels onto the building?

  A. Cranes.

  B. Man-power.

  C. Pulleys.

  D. Hydraulic jacks.

  5. The usual fixed length in the modular system is_______.

  A. twenty centimeters

  B. ten millimeters

  C. fifty centimeters

  D. ten centimeters

  參考答案:

  1. C 2.A 3. B 4. A 5. D

http://www.shddsc.com/

【2014年12月英語六級閱讀強化訓(xùn)練】相關(guān)文章:

英語六級閱讀方法08-10

英語六級閱讀方法5篇08-11

造價工程師考試強化訓(xùn)練題集02-15

2017造價工程師《案例分析》強化訓(xùn)練題01-30

英語六級作文10-09

2017計算機三級網(wǎng)絡(luò)技術(shù)考試強化訓(xùn)練題01-30

《論語》閱讀心得05-13

《簡愛》閱讀心得05-15

藏戲閱讀答案02-16

《小池》閱讀答案04-30

主站蜘蛛池模板: 绥江县| 博罗县| 尤溪县| 盖州市| 南丰县| 石屏县| 呼图壁县| 上虞市| 通许县| 中西区| 河曲县| 长寿区| 石狮市| 达州市| 吉水县| 文安县| 亚东县| 临漳县| 张家港市| 南充市| 江都市| 沙田区| 金寨县| 东方市| 万宁市| 枞阳县| 阜阳市| 平利县| 武胜县| 崇明县| 平顺县| 若羌县| 揭西县| 桐城市| 申扎县| 兴山县| 奉贤区| 荔波县| 鄱阳县| 青田县| 万源市|